Channel Avatar

Englekirk Structural Engineering Center (ESEC) @UCs8RUcCpzNf7ALqtDmNX1iA@youtube.com

496 subscribers - no pronouns :c

The NHERI Large High Performance Outdoor Shake Table (LHPOST


00:31
10-story cold-formed steel building, first-level stair install timelapse, November 20204
01:01:20
Larry Nuss - Concrete Dam Concepts and the Need for Large Scale Shake Testing
46:30
Shiling Pei - NHERI TallWood Project: Seismically Resilient Tall Wood Buildings
01:08:19
Joel Conte - NHERI@UC San Diego Upgraded 6-DOF Large High-Performance Outdoor Shake Table (LHPOST6)
02:18:59
NHERI@UC San Diego User Training Workshop 2022 December 15-16, 2022 - Day 1 (Part 1)
03:27:20
NHERI@UC San Diego User Training Workshop 2022 December 15-16, 2022 - Day 1 (Part 2)
03:26:00
NHERI@UC San Diego User Training Workshop 2022 December 15-16, 2022 - Day 2
01:26
UC San Diego Shake Table upgrade
00:56
Andre Barbosa, Oregon State University, six-story mass timber project, 2023-2024.
00:43
10-story mass-timber building, Loma Prieta Earthquake
01:19
Today's Tests which was run on the Largest Outdoor Seismic Shake Table. Motion was Chi Chi XY
01:06
Today's Tests which was run on the Largest Outdoor Seismic Shake Table. Motion was Northridge
01:10
CW-6 WORLDS LARGEST OUTDOOR SHAKE TABLE K-12 OUTREACH
04:38:25
NHERI@UC San Diego User Training Workshop 2021 December 16-17, 2021 - Day 1
03:51:00
NHERI@UC San Diego User Training Workshop 2021 December 16-17, 2021 - Day 2
00:30
Modular Testbed Building (MTB2) BRB1 M13 RR 1675X 1400Y 0000Z
00:30
Social Media Tags to use for Modular Testbed Building (MTB2) BRB1 M15 RR 1800X 0000Y 0000Z Drone
00:30
Modular Testbed Building (MTB2) SMF MID11 RR 0375X 0375Y 0375Z Drone
00:30
Modular Testbed Building (MTB2) SMF MID13 RR 0675X 0Y 0Z Drone
00:30
Modular Testbed Building (MTB2) SMFCB M12 RR 1000X 1000Y 1000Z
00:30
Modular Testbed Building (MTB2) SMFCBvBRB1
00:44
Tabas Earthquake simulation on LHPOST6 shake table
01:04
Time_lapse of the Table
02:31
Taking Being taken Apart
02:21
Drone Shot of Concrete Being Remove From the Table
03:19
Drone Shot of the Concrete Taking out of the Table
02:05
Drone Shot of the EAST Side of the Concrete Being Taken Away
02:43
Drone Shot of the East Side of the Table
02:28
Drone Shot of the Site
02:33
Drone Shot of the Table Being Taken Apart
01:45
Drone Shot of the Table
03:12
Removing Part of the Concrete From the Table
01:02
Drone Shot of the Actuator From Above
02:27:09
Day 2 Complete
04:40:30
UCSD RAPID Workshop Dec 2020 Day 2 002
04:10:39
UCSD RAPID Workshop Dec 2020 Day 1
20:24
UCSD Virtual Tour 001
01:13:06
Day 2 02 Breakout Session Summaries
18:23
Day 2 01 Holmes
36:33
Day 1 08 Davis
32:49
Day 1 07 Sanchez
26:17
Day 1 06 Nikolaou
31:17
Day 1 05 van de Lindt
17:31
Day 1 04 Hutchinson
14:56
Day 1 03 Restrepo
06:37
Day 1 02 Van Den Einde
01:07:27
Day 1 01 Conte
01:50
World's largest outdoor shake table receives $16 3M from NSF for upgrades
01:00
Drone Shot Of the Table Above
02:09
Drone Video of Accumulator Bank
16:40
SE Plate Being Install
01:02
Drone Shot of the Table
01:02
Drone Shot Of the Pipes
01:05
Drone Shot From Above the Largest Shake Outdoor Shake Table
01:06
Drone Shot Of The Piping System
00:31
Drone Shot From Above the Table
01:44
Video of the Table Being Taken Apart
25:48
Actuator Being installed On SW Side
01:50
Drone Shot From Above the Site
01:28
Drone Video OF the Inside of the Pit Area