Channel Avatar

Shumen Earss @UCV6XBQz-wNvux5EvHBePigQ@youtube.com

51 subscribers - no pronouns :c

More from this channel (soon)


07:32
SK15 Dry-etcher Etching-rate-U% abnormal issue ( part 2)
06:56
SK14 Dry-etcher Etching-rate-U% abnormal issue (part 1)
09:37
SK13 Dry-etcher etching-rate/U%-shift by RCP & edge-shield (part 2)
10:00
SK12 Dry-etcher etch-rate/U%-shift by RCP & edge-shield (part 1)
13:50
SK11 Semi-cotnductor-Industrial park with supplier arround
03:16
SK10 Dry-etcher Easy to clean by purge
05:50
SK9 Dry-etcher suffer process-gas vapor condensed issue
07:26
SK8 Dry-etcher Etching-rate shifted after PM (part-2)
07:00
SK7 Dry-etcher Etching-rate shifted after PM (part-1)
09:03
SK6 Dry-etcher Down due to high-temp. of electrode issue
06:52
SK5 Dry-etcher Transfer-particle-adding issue (part-2)
10:20
SK4 Dry-etcher Transfer-particle-adding issue (part-1)
06:58
SK3 Dry-etcher RF-power managing by SPC
09:32
SK2 Dry-etcher Etch-rate Adjust for SPC-managing
10:28
SK1 Engineer as detective as scientist working at Fab.
11:52
W50 Root-cause finding & Prevention establishing with Wet Bench
09:03
W49 No-power-supply, Earthquake, Facility issue, Fire incident
06:51
W48 Particle abnormal issue due to abnormal causes
06:00
W47 PM / Earthquake causes chemical-cross-contamination
10:54
W46 Chemical causes abnormal status of H/W & Process
06:24
W45 Chemical causes abnormal status of hardware
07:49
W44 Flow-Dynamics for Wet Bench with different kinds
10:54
W43 Concentration or Capability of chemical been shifted
04:07
W42 Manage receiving-real-time-gauge-values with SPC-system
04:27
W41 Preventive Maintenance with Wet Bench ( part-8)
06:42
W40 Preventive Maintenance with Wet Bench (part-7)
04:55
W39 Preventive Maintenance with Wet Bench (part-6)
07:20
W38 Preventive Maintenance with Wet Bench (part-5)
04:22
W37 Preventive Maintenance with Wet Bench (part-4)
07:02
W36 Preventive Maintenance with Wet Bench (part-3)
08:55
W35 Preventive Maintenance with Wet Bench (part-2)
13:51
W34 Preventive Maintenance with Wet Bench (part-1)
06:16
W33 Wet Bench EE get Familiar with H/W & Control-practice
06:50
W32 Wet Bench Chemical-Life-Time general-setting
08:02
W31 Wet Bench Over-Process-Time incident & Product treatment
09:16
W30 Wet Bench Gone-Down SOP for product-wafer
12:47
W29 Wet Bench Temperature-control abnormal issue
14:16
W28 Wet Bench Sensor types for general-usage
06:42
W27 Wet Bench Chemical-Renew Chemical-supply & warm-up
07:37
W26 Wet Bench Chemical-Renew Drain-step-procedure
11:16
W25 Wet Bench Connect Power-supply from facility
08:18
W24 Wet Bench Designer with Dual-Tank/Units
14:49
W23 Wet Bench Chemical-process-Overtime incident
19:26
W22 Wet Bench Emergency-situation notices
12:47
W21 Wet Bench Installation Notices at Fab.
12:59
W20 Wet Bench Water-Resistivity-meter structure
09:45
W19 Wet Bench Chemical-concentration-analyzer structure
11:17
W18 Wet Bench EE/PE cooperate with manufacturer & venders
08:48
W17 Wet Bench Process-chemical usage & MSDS of Hazard
13:02
W16 Wet Bench Robot-move-Teach & move-speed set up
11:12
W15 Wet Bench Robot movement & structure
08:47
W14 Wet Bench wafer to wafer with Gap & Face effect
09:06
W13 Wet Bench Process ( with/without ) cassette
11:36
W12 Wet Bench Chemical-Pump structure
10:11
W11 Wet Bench H3PO4-concentration & temperature control-system
10:06
W10 Wet Bench Nitride-etching with high-temperature-process
09:36
W9 Wet Bench Marangoni-Dryer-tank structure (part-2)
16:59
W8 Wet Bench Marangoni-Dryer-tank structure (part-1)
13:49
W7 Wet Bench IPA-Vapor-Dryer-tank structure
12:08
W6 Wet Bench Chemical-circuit-line Piping