Channel Avatar

Engr changez Khan @UCTQp1xDWp0qSdqxpG_6Z8Mg@youtube.com

2.3K subscribers - no pronouns :c

Civil engnieering related channel all about disscius it *Fo


06:13
Sokkia grx 3 gps data Import and Export complete Details|| sokkia grx 3 gps training in Urdu || GPS
06:35
Sokkia Total station || How to take As Built survey by total station|| topo survey |sokkia tutorial
07:04
How to convert DWG file to KMZ || DWG to KMZ || DWG to Google Earth Full details
10:02
how to create Feature Line|| creat points in civil 3d|| Land Surveyor|| civil 3d tutorial
09:30
How to Extract the Civil 3d File||Export the coordinate and Elevation|| civil 3d training in Urdu
06:52
How to make Offset from the Line with Level || Reference line stake out || GRX3 Gps Training ||
07:57
Cut and Fill Quantity by Gps|| How to make surface by gps||how to calculate quantity by GPS
05:57
sokkia grx3 gps Basic sitting Base and Rover Frequency||how to connect sokkia grx3 gps.
03:48
how to make surface in GPS || Topcon Grx3 Surface|| surface by GPS || Neom project
03:27
Neom project ongoing progress|| Neom project View|| Neom project in KSA ||NEOM
13:02
Survey E600 GPS setup Full Training|| how to setup E600 GPS||
13:29
How to connect one Base and two Rover sokkia Grx3 GPS||sokkia Grx3 GPS basic setup||Flull training
04:31
Leica ts 10 total station Stakeout method|| Layout by Leica ts 10 total station|| part 2
08:09
Leica ts 10 Total station|| How to do Resection by Leica ts 10 total station #Leica 10 total station
04:21
Sokkia Grx3 GPS Base and Rover configuration || Create new job and add point|| basic sitting
04:08
Resection Method Leica TS 07 || Leica Total station Training in Urdu|| Surveyor work in ksa
01:05
Neom city the world biggest Construction line || Neom project progress|| Neom project design
00:17
Surveyor Duty in Neom project saudi Arabia || Level Machine
00:41
Rcc steel Reinforcement || @CivilEngineerss || Neom city
04:00
how to import and Export data in Topcon hiper v GPS || Topcon hiper v Fc 500
02:43
Topcon hiper v FC 500 GPS configuration || Topcon hiper v GPS Basic sitting on site || Neom Project
01:49
column Footing Layout by GPS Axis and Yxis || Topcon gps|| Civil Engineering
02:27
Hiper vr FC 500 configuration || hiper vr basic sitting
01:39
Grade Beam Desgin || Nick Coulm || Coulm Footing || Neom project ksa
04:36
Topcon Hiper vr GPS || stake out by topcon Gps || Full Tranining
02:31
Topcon hyper vr GPS || Topo survey || Asbuilt survey || topographic survey by Topcon Gps
05:33
How to Stake out and offset with the Referince Line method in hiper vr topcon GPS|| Topcon GPs
06:56
Hiper vr Topcon GPS basic Setup || point stake out by topcon gps || 2nd class
05:44
Transmission line Drawing plan || Transmission line working|| 380kv Tower
03:58
How to create a new Job in Hiper Topcon GPS || how to add coordinate by topcon GPS ||UTM coordinate
00:34
Pile A3 class concrete|| how to find pile Volume|| What is Pile|| Bridge sub structure
00:29
Bridge pile Steel Lowering method
00:14
Cage Lowering || pile cage Lowering|| Bridge pile|| how to find pile steel Qty .
03:22
Asphalt payment || Asphalt payment Layout|| how to find Asphalt Quantity
03:43
prestressed Girder details || prestressed Girder shuttring and Steel Reniforcement
09:48
prestressed Girder Profile || Girder profile Details || how to make Girder
09:08
How to insert the Block in Auto cad 2017 || copy command || Lesson 4 Auto cad tutorial 2017
09:01
How to insert Construction Line|| circle command || Auto cad 2017 tutorial || 3rd class
10:00
How to insert the Line with angle || Rectangle Command|| 2017 Auto cad 2class
09:01
Difference between line and polyLine || Difference between boundery and Region 1st class
02:30
Pile Layout || Bridge pile Layout by SO || Layout by stake out
00:16
Girder steel Reniforcement || How to prepare Girder
00:18
Bridge pile concrete|| water Over flow|| what is pile
03:58
How to Area calculate by total station|| Area || Find Area
05:39
Assume coordinate|| Local coordinate|| How to make coordinate on site.
03:37
FoiF RTS 102 total station || Back sight method || How to do Back sight in FoiF RTS total station
07:13
FDT test Complete Calculation || FDT test on Water bound || part 2 || FDT test Complete procedure
02:52
Trimble GPS Tsc3 || Trimble GPS Base and Receiver main setting || Trimble GPS RTK
04:16
FOIF RTS 102 Total station || How to do Resection by Foif Total station || Foif T.S main steup
05:10
Standard penetration Test || spt test || Bridge Soil investigation Test ||civil engineering
02:09
How to make a new job in Topcon hyper Vr GPS||survey by GPS || GPS Training
01:38
How to find coordinates on Mobile App||DWG FastView survey application||
01:44
What is Plumb concrete||Concrete types || Reatning plumb concrete ||Civil Engineering
01:03
Big Mistake in RCC STRUCTURE
01:04
Road Construction Procedure|| which Material suitable for Subgrade || Step by step
01:04
Mohmand Dam Hydro power project || Latest dam construction
14:44
Bridge Drawing || how to read the bridge Drawing
02:03
NJ Barrier concrete || site Video || NJ Barrier top level by the Auto Level machine
02:30
How to do Level Work by Total station || Nikon D120577 total station ||
02:19
how to Read staff reading || Staff reading full details in video || Staff Rod || practically video