Channel Avatar

Power plant with Rahul @UCFQwlpbvNXbaO9L_DZnvGPg@youtube.com

3K subscribers - no pronouns :c

I welcome all of you to my Channel Power plant with Rahul.My


39:58
STEAM TURBINE INTERVIEW QUESTIONS & ANSWER RELATED TO CONDENSER VACUUM PRESSURE & VACUUM BREAKER|
27:44
IMPORTANT STEAM TURBINE INTERVIEW QUESTIONS & ANSWER RELATED TO COASTING DOWN AND SOAKING PERIOD|
41:15
HOW DOES CMC WORK?| HOW DOES LOAD INCREASE AFTER GIVING LOAD RAISE COMMAND IN CMC| BASIC DETAILS|
26:00
BOILER INTERVIEW QUESTIONS & ANSWER| BOILER OPERATION ENGINEERS (BOE) INTERVIEW PREPARATION| PART#2|
24:34
BOILER INTERVIEW QUESTIONS & ANSWER| BOILER OPERATION ENGINEERS (BOE) INTERVIEW PREPRATION| PART#1|
11:53
BOILER WASHING| REASON FOR BOILER WASHING IN THERMAL POWER PLANT| IT'S ADVANTAGES| BASIC DETAILS|
11:37
START UP VENTS| FUNCTIONS OF START UP VENTS| WHY IS IT PROVIDED IN BOILER| WHEN DO WE CLOSE IT|
11:35
WHY BOILER DRUM AIR VENTS TO BE OPENED OR CLOSED AT DRUM PRESSURE 2 KG/ CM2 ? BASIC INFORMATION|
48:36
INTEGRATED SHUT DOWN PROCEDURE OF 500MW THERMAL POWER PLANT| STEP BY STEP OPERATIONAL DETAILS|
55:39
HOT START UP| LIGHT UP PROCEDURE JUST AFTER TRIPPING OF UNIT| STEP BY STEP OPERATIONAL DETAILS|
23:28
CHANGE OVER FROM PRESSURE CONTROL MODE TO LOAD CONTROL MODE| BOILER FOLLOW MODE| TURBINE FOLLOW MODE
45:36
PRESSURE CONTROLLER| LIMIT PRESSURE(LP) MODE & INITIAL PRESSURE (IP) MODE| PRESSURE CONTROL LOOP|
27:17
WORKING OF LOAD CONTROLLER IN EHTC| LOAD CONTROL ACTIVE MODE| LOAD REF, LOAD REF TIME DELAY(PRTD)|
56:47
ELECTRO HYDRAULIC TURBINE CONTROL (EHTC) SYSTEM| SPEED CONTROLLER| SPEED CONTROL LOOP| NR,NRTD,dN/dT
38:24
ACTIVITIES TO BE DONE AFTER SYNCHRONISATION OF UNIT TO FULL LOAD| HOW TO PUT M/C ON CMC| LPH,HPH |
28:34
ACTIVITIES TO BE DONE DURING SYNCHRONISATION OF UNIT| MAIN EXCITATION SYSTEM| PMG| GENERATOR VOLTAGE
18:36
ROLLING OF TURBINE THROUGH ELECTRO HYDRAULIC GOVERNING (EHG)|ROLLING CRITERIA| PART#8| DETAILS|
42:13
ROLLING OF TURBINE THROUGH HYDRAULIC GOVERNING| ACTIVITY TO BE DONE BEFORE ROLLING| PART#7|DETAILS|
29:20
ACTION OF STARTING DEVICE ON SPEEDER GEAR| WHY STARTING DEVICE CALLED LOAD LIMITING DEVICE| DIAGRAM|
27:16
BOILER LIT UP PROCEDURE| PART#6| VACUUM PULLING, GLAND SEAL STEAM CHARGING, HP-LP BYPASS CHARGING|
23:15
BOILER LIT UP PROCEDURE| PART#5| ACTIVITIES TO BE DONE AFTER BOILER LIT UP| CLOSING OF DRUM VENTS|
22:40
BOILER LIT UP PROCEDURE| PART#4| BOILER & TURBINE SIDE CHECKLIST BEFORE TAKING OIL GUN|BASIC DETAILS
22:36
BOILER LIT UP PROCEDURE| PART#3| FROM PURGING TO BOILER LIT UP| APH, IDF, FDF, BCW PUMP, MFT RESET|
36:27
BOILER LIT UP PROCEDURE| PART#2| READINESS OF CONDENSATE WATER AND FEED WATER CYCLE|STEPWISE DETAILS
45:04
BOILER LIT UP PROCEDURE| PART#1|COLD START UP| FROM INITIAL PROCESS TO PUTTING TURBINE ON BARRING|
11:23
WHY TWO CHANNELS ARE PROVIDED IN ONE INDUCED DRAUGHT (ID) FAN?|WHAT IS SOURCE BREAKER & LOAD BREAKER
30:36
VARIABLE FREQUENCY DRIVE(VFD)| DIFFERENCE BETWEEN VFD & CONSTANT SPEED MOTOR DRIVE|HOW DOES IT WORKS
11:15
ADVANTAGES OF VARIABLE FREQUENCY DRIVE (VFD) SYSTEM USED IN THERMAL POWER PLANT| BASIC INFORMATION|
20:59
WHY SCANNER AIR FANS ARE USED IN THERMAL POWER PLANT?|IT'S IMPORTANCE| INTERLOCK| BASIC INFORMATION|
21:45
WHY SEAL AIR FANS ARE USED IN THERMAL POWER PLANT?| IT'S FUNCTION| INTERLOCKS| BASIC INFORMATION|
08:01
LINE DIAGRAM OF LUBE OIL SYSTEM OF INDUCED DRAUGHT (ID) FAN| IT'S COMPONENTS| BASIC DETAILS| PART#2|
15:38
INDUCED DRAUGHT (ID) FAN| IT'S IMPORTANCE IN POWER PLANT| DIFFERENCE BETWEEN ID FAN & FD FAN| PART#1
19:31
INTERLOCKS & PROTECTION OF INDUCED DRAUGHT (ID) FAN| START PERMISSIVE & TRIPPING CONDITION| PART#3|
14:52
HYDRAULIC IMPELLER BLADE ADJUSTMENT SYSTEM| BLADE PITCH CONTROL MECHANISM| EXPLANATION WITH DRAWING|
17:27
PARALLEL OPERATION OF FORCE DRAUGHT (FD) FAN| STALLING PHENOMENON| CHARACTERISTICS CURVE| PART#3|
25:03
INTERLOCKS ( START PERMISSIVE) & TRIPPING CONDITION OF FORCE DRAUGHT ( FD) FAN| FULL DETAILS| PART#2
23:49
FORCE DRAUGHT ( FD) FAN| IT'S IMPORTANCE IN THERMAL POWER PLANT| SECONDARY AIR DUCT LAYOUT| PART#1|
31:53
PARALLEL OPERATION OF PRIMARY AIR (PA) FANS| REASON OF STALLING IN FAN| FAN CHARACTERISTICS|DETAILS
10:27
FORCE DRAUGHT (FD)OR PRIMARY AIR (PA) FAN LUBE OIL LINE DIAGRAM WITH FULL DESCRIPTION| PART#3|
11:52
INTERLOCKS & PROTECTION OF PRIMARY AIR (PA) FAN| START PERMISSIVE| BASIC INFORMATION| PART#4
12:09
INTERNAL COMPONENTS OF PRIMARY AIR (PA) OR FD FAN| IMPELLER| DIFFUSER| BASIC INFORMATION| PART#2|
15:20
PRIMARY AIR (PA) FAN| IT'S FUNCTION IN THERMAL POWER PLANT| HOT & COLD PA HEADER| BASIC INFORMATION|
14:16
PRIMARY AIR(PA) HEADER PRESSURE CONTROL SYSTEM| HOW DOES IT WORK| HOW TO PUT PA FAN ON AUTO| DETAILS
36:49
WHY DO WE CONTROL AIR FLOW IN BOILER| AIR FLOW CONTROL LOGIC WITH DESCRIPTION| TOTAL AIR FLOW|
29:03
CMC PAGE DESCRIPTION IN FULL DETAILS| FGMO| RGMO| UNIT LOAD SP| SLIDING PRESSURE| HOW DOES IT WORK|
29:49
IMPORTANT CONTROL SIGNALS| INCREASE BLOCK / DECREASE BLOCK| RUN UP / RUN DOWN CONDITION| RUN BACK|
23:32
COORDINATED MASTER CONTROL (CMC)| PART#3| DIFFERENCE WITH BOILER FOLLOW MODE| HOW TO PUT M/C ON CMC|
28:12
BOILER FOLLOW MODE WITH TURBINE MASTER ON MANUAL| PART#2| DIFFERENCE WITH TURBINE FOLLOW MODE| CMC|
21:21
TURBINE FOLLOW MODE WITH BOILER MASTER ON MANUAL| CMC| PART#1|BRIEF DISCUSSION WITH LOGICAL DIAGRAM|
14:58
STEAM COILED AIR PREHATER(SCAPH)| EFFECT OF APH LEAKAGE|REASON FOR LOW TEMP OF FLUE GAS AT APH O/L|
26:12
REASONS FOR THE INCREASE IN FLUE GAS TEMPERATURE HIGH AT APH OUTLET OR HIGH STACK TEMP | REMEDIES|
20:50
CHIMNEY| PURPOSE OF CHIMNEY USED IN POWER PLANT| WHY CHIMNEYS ARE KEPT AT GREAT HEIGHT|BASIC DETAILS
24:03
ACID DEW POINT (ADP)| ON WHICH FACTORS ADP DEPEND?| COLD END CORROSION| SO2, SO3, H2SO4, H2SO3|
27:42
WHAT SHOULD BE THE MINIMUM FLUE GAS EXIT TEMP AT STACK?| ON WHICH FACTOR IT DEPENDS?| ACID DEW POINT
15:22
ZIRCONIA OXYGEN ANALYZER| WORKING PRINCIPLE| COMPONENTS & IT'S FUNCTION| HOW DOES IT WORK| BASIC|
20:30
OXYGEN ANALYZER| IT'S FUNCTION| WHY DO WE INSTALL OXYGEN ANALYZER IN THERMAL POWER PLANT|
18:14
WHY DO WE SUPPLY EXCESS AIR FOR COMBUSTION PROCESS OF PULVERIZED COAL IN THERMAL POWER PLANT| BASIC
11:57
WHY DO WE INSTALL OXYGEN ANALYZER IN BETWEEN ECONOMISER OUTLET AND APH INLET TO CONTROL EXCESS AIR?|
19:07
WHY DO WE MAINTAIN THE FURNACE TO WIND BOX DP| LOGICAL DIAGRAM|TANGENTIAL FIRING BOILER| PART-3|
23:51
FUNCTIONS OF SECONDARY AIR DAMPER CONTROL SYSTEM| INTERLOCKS OF AUXILIARY & FUEL AIR DAMPERS|DETAILS