Channel Avatar

Power plant with Rahul @UCFQwlpbvNXbaO9L_DZnvGPg@youtube.com

3K subscribers - no pronouns :c

I welcome all of you to my Channel Power plant with Rahul.My


39:58
STEAM TURBINE INTERVIEW QUESTIONS & ANSWER RELATED TO CONDENSER VACUUM PRESSURE & VACUUM BREAKER|
27:44
IMPORTANT STEAM TURBINE INTERVIEW QUESTIONS & ANSWER RELATED TO COASTING DOWN AND SOAKING PERIOD|
41:15
HOW DOES CMC WORK?| HOW DOES LOAD INCREASE AFTER GIVING LOAD RAISE COMMAND IN CMC| BASIC DETAILS|
26:00
BOILER INTERVIEW QUESTIONS & ANSWER| BOILER OPERATION ENGINEERS (BOE) INTERVIEW PREPARATION| PART#2|
24:34
BOILER INTERVIEW QUESTIONS & ANSWER| BOILER OPERATION ENGINEERS (BOE) INTERVIEW PREPRATION| PART#1|
11:53
BOILER WASHING| REASON FOR BOILER WASHING IN THERMAL POWER PLANT| IT'S ADVANTAGES| BASIC DETAILS|
11:37
START UP VENTS| FUNCTIONS OF START UP VENTS| WHY IS IT PROVIDED IN BOILER| WHEN DO WE CLOSE IT|
11:35
WHY BOILER DRUM AIR VENTS TO BE OPENED OR CLOSED AT DRUM PRESSURE 2 KG/ CM2 ? BASIC INFORMATION|
48:36
INTEGRATED SHUT DOWN PROCEDURE OF 500MW THERMAL POWER PLANT| STEP BY STEP OPERATIONAL DETAILS|
55:39
HOT START UP| LIGHT UP PROCEDURE JUST AFTER TRIPPING OF UNIT| STEP BY STEP OPERATIONAL DETAILS|
23:28
CHANGE OVER FROM PRESSURE CONTROL MODE TO LOAD CONTROL MODE| BOILER FOLLOW MODE| TURBINE FOLLOW MODE
45:36
PRESSURE CONTROLLER| LIMIT PRESSURE(LP) MODE & INITIAL PRESSURE (IP) MODE| PRESSURE CONTROL LOOP|
27:17
WORKING OF LOAD CONTROLLER IN EHTC| LOAD CONTROL ACTIVE MODE| LOAD REF, LOAD REF TIME DELAY(PRTD)|
56:47
ELECTRO HYDRAULIC TURBINE CONTROL (EHTC) SYSTEM| SPEED CONTROLLER| SPEED CONTROL LOOP| NR,NRTD,dN/dT
38:24
ACTIVITIES TO BE DONE AFTER SYNCHRONISATION OF UNIT TO FULL LOAD| HOW TO PUT M/C ON CMC| LPH,HPH |
28:34
ACTIVITIES TO BE DONE DURING SYNCHRONISATION OF UNIT| MAIN EXCITATION SYSTEM| PMG| GENERATOR VOLTAGE
18:36
ROLLING OF TURBINE THROUGH ELECTRO HYDRAULIC GOVERNING (EHG)|ROLLING CRITERIA| PART#8| DETAILS|
42:13
ROLLING OF TURBINE THROUGH HYDRAULIC GOVERNING| ACTIVITY TO BE DONE BEFORE ROLLING| PART#7|DETAILS|
29:20
ACTION OF STARTING DEVICE ON SPEEDER GEAR| WHY STARTING DEVICE CALLED LOAD LIMITING DEVICE| DIAGRAM|
27:16
BOILER LIT UP PROCEDURE| PART#6| VACUUM PULLING, GLAND SEAL STEAM CHARGING, HP-LP BYPASS CHARGING|
23:15
BOILER LIT UP PROCEDURE| PART#5| ACTIVITIES TO BE DONE AFTER BOILER LIT UP| CLOSING OF DRUM VENTS|
22:40
BOILER LIT UP PROCEDURE| PART#4| BOILER & TURBINE SIDE CHECKLIST BEFORE TAKING OIL GUN|BASIC DETAILS
22:36
BOILER LIT UP PROCEDURE| PART#3| FROM PURGING TO BOILER LIT UP| APH, IDF, FDF, BCW PUMP, MFT RESET|
36:27
BOILER LIT UP PROCEDURE| PART#2| READINESS OF CONDENSATE WATER AND FEED WATER CYCLE|STEPWISE DETAILS
45:04
BOILER LIT UP PROCEDURE| PART#1|COLD START UP| FROM INITIAL PROCESS TO PUTTING TURBINE ON BARRING|
11:23
WHY TWO CHANNELS ARE PROVIDED IN ONE INDUCED DRAUGHT (ID) FAN?|WHAT IS SOURCE BREAKER & LOAD BREAKER
30:36
VARIABLE FREQUENCY DRIVE(VFD)| DIFFERENCE BETWEEN VFD & CONSTANT SPEED MOTOR DRIVE|HOW DOES IT WORKS
11:15
ADVANTAGES OF VARIABLE FREQUENCY DRIVE (VFD) SYSTEM USED IN THERMAL POWER PLANT| BASIC INFORMATION|
20:59
WHY SCANNER AIR FANS ARE USED IN THERMAL POWER PLANT?|IT'S IMPORTANCE| INTERLOCK| BASIC INFORMATION|
21:45
WHY SEAL AIR FANS ARE USED IN THERMAL POWER PLANT?| IT'S FUNCTION| INTERLOCKS| BASIC INFORMATION|