Channel Avatar

SP Steve @UC1ZcdpFCOwqa4BtBFaentXA@youtube.com

5.1K subscribers - no pronouns :c

This YouTube channel was created to share my hobby interests


15:25
Layout Update. Blair Line Greene's Feed and Seed Part 1
33:41
How to Design Basic LED Circuits for your Projects
11:58
Tangent, Gunderson 50' High Cube Cotton Belt and Rio Grande Box Cars. First Look and Impressions
09:11
Layout Update. DPM Models, Laube's Linen Mill Part 3. LED Lighting and Project Completion.
12:46
Athearn Genesis Golden West Service 50' Box Cars. First Look, Impressions and Run-by's.
19:02
Scale Trains Rio Grande GP40. First Look, Impressions, and Run-By's.
12:07
Scale Trains Rio Grande SD45. Return from Warranty Repair. Speed Matching and Test Run.
36:24
Layout Update. DPM Models, Laube's Linen Mill Part 2. Scratch Building and Oil Paint Weathering.
13:24
Driving 1600 Miles to Buy a New 2024 Heritage Bronco
14:58
2024 Layout Review and Plans for 2025
19:06
Cleaning and Maintaining Your Airbrush and Paint Brushes for Best Performance.
23:38
Layout Update. DPM Models, Laube's Linen Mill Part 1. Construction, Paint and Brick Mortar.
10:58
Moloco 50' High Cube ACF "Waffle" Cars. First Look, Impressions and Run-by's.
20:07
Digitrax UR93 Transceiver and DT602D Wireless Duplex Throttle. Installation and Impressions.
10:48
Scale Trains / ExactRail Platinum PS-2CD 4427 Covered Hopper. First Look, Impressions and Run-By's.
39:56
Layout Update. Build, Paint, Weather and Install the North Canyon Highway Overpass Bridge.
33:27
Layout Update. Applying Dirt and Ballast to the City Track and Upper Cliffs Track.
19:41
Athearn Genesis Southern Pacific GP9. First Look and Impressions.
29:01
Layout Update. Lift-out Section Scenery. Groundwork, Ballast, Static Grass. Train Run-by's
15:00
Scale Trains Rio Grande SD45. First Look and Impressions
34:14
Layout Update. Finishing the South Tunnel. Paint, Groundwork, Track Ballast and Run-by's
25:47
Layout Update. Lower Cliff Rocks. Installation. Painting Plaster Rock Castings with Craft Acrylics.
06:04
Layout Ideas. Northern Arizona Scenery for Your Layout.
27:20
Layout Update. Buried Track Part 2. Finishing Details and 17 Minutes of OPS Track Testing.
17:59
Layout Update. Buried Track. Burying the Stonewall Section of Track in Dirt.
30:29
Layout Update. Widening Benchwork, adding a Spur Track and Powering the Turnout Frog.
29:41
Scale Trains Museum Quality, Southern Pacific SD45X. A First Look, Impressions and Test Running.
18:48
Layout Update. The Cliffs. Painting the Cliff Rocks, Painting the Tracks and Adding Ballast.
12:27
American Limited Models. Santa Fe 16,000 Gallon Petroleum Tank Cars. A First Look and Test Run.
18:16
Layout Tour Part 2. Structures. Planning My City and Location of Industries.
27:13
Layout Tour Part 1. Thoughts, Ideas, Where I'm at and Where I'm going.
17:37
Layout Update. Weathering the Deck Girder Bridge. North Canyon Part 6.
27:17
Athearn Genesis GATC 2600 Covered Hoppers. First Look and Short Ops Session.
13:55
Layout Update. Installing a Mirror. Finishing the Rock and Groundwork. North Canyon Part5
14:52
Moloco 50' Box Cars. Northern Pacific, Rock Island, Burlington Route. First Look.
15:41
Layout Update. Installing Ballast and Detailing Atlas Flex Track.
14:45
Athearn Genesis, DCC LED Lights Caboose, Covered Hoppers, and 50' Box Car.
20:38
Layout Update. North Canyon Part 3, Painting Rocks and Stone Abutments and Applying Dirt.
12:45
Scale Trains Museum Quality Milwaukee Road SDL39. First Impressions.
15:25
Layout Update. North Canyon Part 2, Casting and Installing Hydrocal Rocks.
10:24
Athearn Genesis Santa Fe Pinstripe SD45-2. A First look.
17:23
Layout Update. North Canyon Part 1. Installing and Painting Hydrocal Rocks.
15:05
Layout Update. Installing a LARC Products Pro 10.5 Photo Backdrop
10:57
Layout Update. Casting Retaining Wall Columns from Hydrocal Plaster.
16:42
Layout Update. Finishing the Corner Groundwork. Painting Rocks and Track, Adding Dirt.
11:02
Layout Update. Painting Rocks with Craft Acrylics.
10:25
Tangent Southern Pacific 1968 40' Box Car Rebuilds. First Look and Impressions.
17:13
Layout Update. Painting Stone Walls.
19:12
Athearn Genesis Southern Pacific MT-4 4-8-2 with DCC and Sound. Initial Impressions and Test Run.
16:58
Layout Update. Adding the first bits of Scenery to the Layout.
18:32
Prairie Shadows 50' High Cube Box Cars from HomeShops. Initial Look and Test Run.
12:36
A body Dorman fuel tank and sender installation. 2024 Rallye 350 Restoration Part 14.
02:02
Restoparts Reproduction 1970-1979 Oldsmobile Sport Steering Wheel. 2024 Rallye350 Restoration Part13
03:48
Scale Trains Rivet Counter Southern Pacific SD38-2. A Quick Look.
17:53
Factory 2.25" Dual Exhaust with Thrush Welded Mufflers. 2024 Rallye 350 Restoration Part 12.
06:45
Muncie M21, Flywheel, Clutch Installation. 2024 Olds Rallye 350 Restoration Part 11
11:53
Scale Trains Cotton Belt GP30. A First Look and Impressions of the Locomotive.
10:08
Hurst Competition Plus Installation on Muncie M21. 2024 Olds Rallye 350 Restoration Part 10
10:11
Bowser Southern Pacific RS3 Repaint and Arrowhead Models D&RGW Open Hopper Running on the Layout.
04:39
GM Rear Drum Brakes and UMI A Body Rear Control Arms. 1970 Olds Rallye 350 Restoration 2024 Part 9